Talk to the director
A Child'S Place Academy Llc
1508 E 63RD ST, Chicago, IL 60637For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.
Is it being fixed?
Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.
- Repeat — cited before, still not corrected· open ~14 months
Biennial staff physical re-examination not completed
407100F
“DCFS recorded on May 16, 2025: Biennial staff physical re-examination not completed (407100F). It was cited before and is recorded as still not corrected. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~14 months
Infant & toddler special requirement not met
407210F24
“DCFS recorded on May 16, 2025: Infant & toddler special requirement not met (407210F24). It was cited before and is recorded as still not corrected. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~11 monthsProtective plan
Children were NOT properly supervised
407200R
“DCFS recorded on Sep 9, 2025: Children were NOT properly supervised (407200R). It was confirmed and a corrective plan is in progress. I also noticed a protective plan on the record around this. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~11 monthsProtective plan
Program operations requirement not met
407200P
“DCFS recorded on Sep 9, 2025: Program operations requirement not met (407200P). It was confirmed and a corrective plan is in progress. I also noticed a protective plan on the record around this. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~11 monthsProtective plan
Transportation safety requirement not met
407280I
“DCFS recorded on Sep 9, 2025: Transportation safety requirement not met (407280I). It was confirmed and a corrective plan is in progress. I also noticed a protective plan on the record around this. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~11 monthsProtective plan
Transportation safety requirement not met
407280O
“DCFS recorded on Sep 9, 2025: Transportation safety requirement not met (407280O). It was confirmed and a corrective plan is in progress. I also noticed a protective plan on the record around this. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~11 monthsProtective plan
Transportation safety requirement not met
407280C2
“DCFS recorded on Sep 9, 2025: Transportation safety requirement not met (407280C2). It was confirmed and a corrective plan is in progress. I also noticed a protective plan on the record around this. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~11 monthsProtective plan
Transportation safety requirement not met
407280D
“DCFS recorded on Sep 9, 2025: Transportation safety requirement not met (407280D). It was confirmed and a corrective plan is in progress. I also noticed a protective plan on the record around this. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Required staff-to-child ratio was not maintained
407190A
“DCFS recorded on May 16, 2025: Required staff-to-child ratio was not maintained (407190A). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Personnel records or documentation requirement not met
407120A1
“DCFS recorded on May 16, 2025: Personnel records or documentation requirement not met (407120A1). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Staff member with disqualifying criminal record working with children (Health Care Worker Background Check Act §25-II)
CCASEC46II
“DCFS recorded on May 16, 2025: Staff member with disqualifying criminal record working with children (Health Care Worker Background Check Act §25-II) (CCASEC46II). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Staff member with NON-WAIVABLE disqualifying criminal record working with children (Health Care Worker Background Check Act §25-I)
CCASEC46I
“DCFS recorded on May 16, 2025: Staff member with NON-WAIVABLE disqualifying criminal record working with children (Health Care Worker Background Check Act §25-I) (CCASEC46I). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Personnel records or documentation requirement not met
407120A3
“DCFS recorded on May 16, 2025: Personnel records or documentation requirement not met (407120A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Personnel records or documentation requirement not met
407120A4
“DCFS recorded on May 16, 2025: Personnel records or documentation requirement not met (407120A4). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Program operations requirement not met
407200D7
“DCFS recorded on May 16, 2025: Program operations requirement not met (407200D7). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Enrollment or discharge procedure not followed
407250I4A
“DCFS recorded on May 16, 2025: Enrollment or discharge procedure not followed (407250I4A). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Child health record or immunization requirement not met
407310D
“DCFS recorded on May 16, 2025: Child health record or immunization requirement not met (407310D). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Indoor facility or space safety requirement not met
407370E3
“DCFS recorded on May 16, 2025: Indoor facility or space safety requirement not met (407370E3). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Indoor facility or space safety requirement not met
407370E11
“DCFS recorded on May 16, 2025: Indoor facility or space safety requirement not met (407370E11). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Indoor facility or space safety requirement not met
407370R3
“DCFS recorded on May 16, 2025: Indoor facility or space safety requirement not met (407370R3). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Indoor facility or space safety requirement not met
407370F2
“DCFS recorded on May 16, 2025: Indoor facility or space safety requirement not met (407370F2). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 16, 2025 to Jun 15, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”