GoldiCheck
← Back to the full record

Talk to the director

A-Zmall World Child Development Center

2629 S LAWNDALE AVE, Chicago, IL 60623

For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.

Is it being fixed?

Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.

  • Past the correction deadline· open ~2 years

    Indoor facility or space safety requirement not met

    407370Q2

    DCFS recorded on Aug 1, 2024: Indoor facility or space safety requirement not met (407370Q2). It is recorded as past its correction deadline. A corrective plan ran from Aug 1, 2024 to Sep 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Personnel records or documentation requirement not met

    407120A

    DCFS recorded on Nov 7, 2025: Personnel records or documentation requirement not met (407120A). It was confirmed and a corrective plan is in progress. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Personnel records or documentation requirement not met

    407120A

    DCFS recorded on Nov 7, 2025: Personnel records or documentation requirement not met (407120A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 7, 2025 to Dec 7, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Equipment or toy safety requirement not met

    407380K

    DCFS recorded on Nov 7, 2025: Equipment or toy safety requirement not met (407380K). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 7, 2025 to Dec 7, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Outdoor playground safety requirement not met

    407390I

    DCFS recorded on Nov 7, 2025: Outdoor playground safety requirement not met (407390I). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 7, 2025 to Dec 7, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Nutrition or meal service requirement not met

    407330B

    DCFS recorded on Nov 7, 2025: Nutrition or meal service requirement not met (407330B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 7, 2025 to Dec 7, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Personnel records or documentation requirement not met

    407120A4

    DCFS recorded on Aug 1, 2024: Personnel records or documentation requirement not met (407120A4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 1, 2024 to Sep 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)

    407110

    DCFS recorded on Aug 1, 2024: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 1, 2024 to Sep 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370F2

    DCFS recorded on Aug 1, 2024: Indoor facility or space safety requirement not met (407370F2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 1, 2024 to Sep 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370E

    DCFS recorded on Aug 1, 2024: Indoor facility or space safety requirement not met (407370E). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 1, 2024 to Sep 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

10 of 10 selected