GoldiCheck
← Back to the full record

Talk to the director

Bjbe Early Childhd Prog At The Chava Ctr…

1201 LAKE COOK RD, Deerfield, IL 60015

For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.

Is it being fixed?

Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.

  • Confirmed — corrective plan in progress· open ~7 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790A5

    DCFS recorded on Dec 11, 2025: Staffing structure requirement not met (director oversight or on-site presence) (40790A5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 11, 2025 to Jan 10, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~7 months

    Annual 15-clock-hour in-service training requirement not met

    407100C5

    DCFS recorded on Dec 11, 2025: Annual 15-clock-hour in-service training requirement not met (407100C5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 11, 2025 to Jan 10, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~7 months

    Biennial staff physical re-examination not completed

    407100F

    DCFS recorded on Dec 11, 2025: Biennial staff physical re-examination not completed (407100F). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 11, 2025 to Jan 10, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~7 months

    Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)

    407110

    DCFS recorded on Dec 11, 2025: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 11, 2025 to Jan 10, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~7 months

    Personnel records or documentation requirement not met

    407120B

    DCFS recorded on Dec 11, 2025: Personnel records or documentation requirement not met (407120B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 11, 2025 to Jan 10, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~7 months

    Nutrition or meal service requirement not met

    407330B

    DCFS recorded on Dec 11, 2025: Nutrition or meal service requirement not met (407330B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 11, 2025 to Jan 10, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~7 months

    Medication handling requirement not met

    407360D4

    DCFS recorded on Dec 11, 2025: Medication handling requirement not met (407360D4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 11, 2025 to Jan 10, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~7 months

    Indoor facility or space safety requirement not met

    407370O1

    DCFS recorded on Dec 11, 2025: Indoor facility or space safety requirement not met (407370O1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 11, 2025 to Jan 10, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

8 of 8 selected