GoldiCheck
← Back to the full record

Talk to the director

Blooming Minds Early Learning Center

653 WINDSOR DR, Schaumburg, IL 60193

For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.

Is it being fixed?

Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.

  • Past the correction deadline· open ~2 years

    Equipment or toy safety requirement not met

    407380K

    DCFS recorded on Sep 28, 2023: Equipment or toy safety requirement not met (407380K). It is recorded as past its correction deadline. A corrective plan ran from Sep 28, 2023 to Oct 28, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· opened recently

    Staff qualification or training requirement not met

    407100H

    DCFS recorded on Jul 24, 2026: Staff qualification or training requirement not met (407100H). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 24, 2026 to Aug 23, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· opened recently

    Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)

    407110

    DCFS recorded on Jul 24, 2026: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 24, 2026 to Aug 23, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· opened recently

    Personnel records or documentation requirement not met

    407120A2

    DCFS recorded on Jul 24, 2026: Personnel records or documentation requirement not met (407120A2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 24, 2026 to Aug 23, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· opened recently

    Personnel records or documentation requirement not met

    407120A3

    DCFS recorded on Jul 24, 2026: Personnel records or documentation requirement not met (407120A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 24, 2026 to Aug 23, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· opened recently

    Nutrition or meal service requirement not met

    407330L1

    DCFS recorded on Jul 24, 2026: Nutrition or meal service requirement not met (407330L1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 24, 2026 to Aug 23, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· opened recently

    Diapering or toileting requirement not met

    407340A5

    DCFS recorded on Jul 24, 2026: Diapering or toileting requirement not met (407340A5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 24, 2026 to Aug 23, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· opened recently

    UNSAFE infant sleep position — SIDS risk (back-to-sleep required)

    407350B2

    DCFS recorded on Jul 24, 2026: UNSAFE infant sleep position — SIDS risk (back-to-sleep required) (407350B2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 24, 2026 to Aug 23, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· opened recently

    Indoor facility or space safety requirement not met

    407370E11

    DCFS recorded on Jul 24, 2026: Indoor facility or space safety requirement not met (407370E11). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 24, 2026 to Aug 23, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

9 of 9 selected