8501 S ASHLAND AVE, Chicago, IL 60620For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.
Is it being fixed?
Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.
- Confirmed — corrective plan in progress· open ~11 months
Staff orientation — required document reviews not recorded in personnel files
40770E
“DCFS recorded on Aug 11, 2025: Staff orientation — required document reviews not recorded in personnel files (40770E). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 11, 2025 to Sep 10, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~11 months
Annual 15-clock-hour in-service training requirement not met
407100C5
“DCFS recorded on Aug 11, 2025: Annual 15-clock-hour in-service training requirement not met (407100C5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 11, 2025 to Sep 10, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~11 months
Personnel records or documentation requirement not met
407120A6
“DCFS recorded on Aug 11, 2025: Personnel records or documentation requirement not met (407120A6). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 11, 2025 to Sep 10, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~11 months
Indoor facility or space safety requirement not met
407370E
“DCFS recorded on Aug 11, 2025: Indoor facility or space safety requirement not met (407370E). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 11, 2025 to Sep 10, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~11 months
Indoor facility or space safety requirement not met
407370E2
“DCFS recorded on Aug 11, 2025: Indoor facility or space safety requirement not met (407370E2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 11, 2025 to Sep 10, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~11 months
Indoor facility or space safety requirement not met
407370E3
“DCFS recorded on Aug 11, 2025: Indoor facility or space safety requirement not met (407370E3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 11, 2025 to Sep 10, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~11 months
Indoor facility or space safety requirement not met
407370E6
“DCFS recorded on Aug 11, 2025: Indoor facility or space safety requirement not met (407370E6). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 11, 2025 to Sep 10, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Daily arrival or departure procedure not followed
407260D
“DCFS recorded on Jun 9, 2025: Daily arrival or departure procedure not followed (407260D). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jun 9, 2025 to Jun 9, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Daily arrival or departure procedure not followed
407260E3
“DCFS recorded on Jun 9, 2025: Daily arrival or departure procedure not followed (407260E3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jun 9, 2025 to Jun 9, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”