GoldiCheck
← Back to the full record

Talk to the director

Chicago Kidz Klub

4344 S WENTWORTH AVE, Chicago, IL 60609

For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.

Is it being fixed?

Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.

  • Confirmed — corrective plan in progress· open ~5 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790A1

    DCFS recorded on Feb 17, 2026: Staffing structure requirement not met (director oversight or on-site presence) (40790A1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 17, 2026 to Mar 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~5 months

    Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease)

    407100C1

    DCFS recorded on Feb 17, 2026: Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease) (407100C1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 17, 2026 to Mar 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~5 months

    Biennial staff physical re-examination not completed

    407100F

    DCFS recorded on Feb 17, 2026: Biennial staff physical re-examination not completed (407100F). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 17, 2026 to Mar 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~5 months

    Personnel records or documentation requirement not met

    407120A3

    DCFS recorded on Feb 17, 2026: Personnel records or documentation requirement not met (407120A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 17, 2026 to Mar 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~5 months

    Personnel records or documentation requirement not met

    407120A4

    DCFS recorded on Feb 17, 2026: Personnel records or documentation requirement not met (407120A4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 17, 2026 to Mar 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~5 months

    Personnel records or documentation requirement not met

    407120E4

    DCFS recorded on Feb 17, 2026: Personnel records or documentation requirement not met (407120E4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 17, 2026 to Mar 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~5 months

    Early childhood teacher qualification not met

    407140C3

    DCFS recorded on Feb 17, 2026: Early childhood teacher qualification not met (407140C3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 17, 2026 to Mar 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~5 months

    Early childhood assistant qualification not met

    407150B

    DCFS recorded on Feb 17, 2026: Early childhood assistant qualification not met (407150B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 17, 2026 to Mar 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~5 months

    Child health record or immunization requirement not met

    407310A

    DCFS recorded on Feb 17, 2026: Child health record or immunization requirement not met (407310A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 17, 2026 to Mar 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~5 months

    Child health record or immunization requirement not met

    407310A5

    DCFS recorded on Feb 17, 2026: Child health record or immunization requirement not met (407310A5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 17, 2026 to Mar 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~5 months

    Child health record or immunization requirement not met

    407310A6

    DCFS recorded on Feb 17, 2026: Child health record or immunization requirement not met (407310A6). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 17, 2026 to Mar 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~5 months

    Safe sleep practice requirement not met

    407350E

    DCFS recorded on Feb 17, 2026: Safe sleep practice requirement not met (407350E). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 17, 2026 to Mar 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~11 months

    Child care director qualification requirement not met

    407130L

    DCFS recorded on Aug 29, 2025: Child care director qualification requirement not met (407130L). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 29, 2025 to Sep 2, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Radon testing proof missing for license renewal (IEMA-licensed tester required every 3 years)

    40760G

    DCFS recorded on Jul 30, 2025: Radon testing proof missing for license renewal (IEMA-licensed tester required every 3 years) (40760G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Organization and administration requirement not met (§407.70 general)

    40770H

    DCFS recorded on Jul 30, 2025: Organization and administration requirement not met (§407.70 general) (40770H). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Organization and administration requirement not met (§407.70 general)

    40770N3

    DCFS recorded on Jul 30, 2025: Organization and administration requirement not met (§407.70 general) (40770N3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790A1

    DCFS recorded on Jul 30, 2025: Staffing structure requirement not met (director oversight or on-site presence) (40790A1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790A2

    DCFS recorded on Jul 30, 2025: Staffing structure requirement not met (director oversight or on-site presence) (40790A2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790A4

    DCFS recorded on Jul 30, 2025: Staffing structure requirement not met (director oversight or on-site presence) (40790A4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790D2

    DCFS recorded on Jul 30, 2025: Staffing structure requirement not met (director oversight or on-site presence) (40790D2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)

    407110

    DCFS recorded on Jul 30, 2025: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Personnel records or documentation requirement not met

    407120A

    DCFS recorded on Jul 30, 2025: Personnel records or documentation requirement not met (407120A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Personnel records or documentation requirement not met

    407120A3

    DCFS recorded on Jul 30, 2025: Personnel records or documentation requirement not met (407120A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Personnel records or documentation requirement not met

    407120A4

    DCFS recorded on Jul 30, 2025: Personnel records or documentation requirement not met (407120A4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Personnel records or documentation requirement not met

    407120E4

    DCFS recorded on Jul 30, 2025: Personnel records or documentation requirement not met (407120E4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Early childhood assistant qualification not met

    407150B

    DCFS recorded on Jul 30, 2025: Early childhood assistant qualification not met (407150B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Required staff-to-child ratio was not maintained

    407190A1

    DCFS recorded on Jul 30, 2025: Required staff-to-child ratio was not maintained (407190A1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Required staff-to-child ratio was not maintained

    407190D4

    DCFS recorded on Jul 30, 2025: Required staff-to-child ratio was not maintained (407190D4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Staff counted toward ratios without meeting required qualification

    407190F

    DCFS recorded on Jul 30, 2025: Staff counted toward ratios without meeting required qualification (407190F). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Required staff-to-child ratio was not maintained

    407190G

    DCFS recorded on Jul 30, 2025: Required staff-to-child ratio was not maintained (407190G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Program operations requirement not met

    407200B

    DCFS recorded on Jul 30, 2025: Program operations requirement not met (407200B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Program operations requirement not met

    407200D

    DCFS recorded on Jul 30, 2025: Program operations requirement not met (407200D). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Program operations requirement not met

    407200D3

    DCFS recorded on Jul 30, 2025: Program operations requirement not met (407200D3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Program operations requirement not met

    407200J

    DCFS recorded on Jul 30, 2025: Program operations requirement not met (407200J). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Program operations requirement not met

    407200N

    DCFS recorded on Jul 30, 2025: Program operations requirement not met (407200N). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Infant & toddler special requirement not met

    407210F19

    DCFS recorded on Jul 30, 2025: Infant & toddler special requirement not met (407210F19). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Infant & toddler special requirement not met

    407210H8

    DCFS recorded on Jul 30, 2025: Infant & toddler special requirement not met (407210H8). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    School-age program requirement not met

    407220C

    DCFS recorded on Jul 30, 2025: School-age program requirement not met (407220C). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Enrollment or discharge procedure not followed

    407250I4A

    DCFS recorded on Jul 30, 2025: Enrollment or discharge procedure not followed (407250I4A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Daily arrival or departure procedure not followed

    407260B

    DCFS recorded on Jul 30, 2025: Daily arrival or departure procedure not followed (407260B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Daily arrival or departure procedure not followed

    407260D

    DCFS recorded on Jul 30, 2025: Daily arrival or departure procedure not followed (407260D). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    DISCIPLINE — rules on treatment of children not followed

    407270G

    DCFS recorded on Jul 30, 2025: DISCIPLINE — rules on treatment of children not followed (407270G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Nutrition or meal service requirement not met

    407330A

    DCFS recorded on Jul 30, 2025: Nutrition or meal service requirement not met (407330A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Nutrition or meal service requirement not met

    407330B

    DCFS recorded on Jul 30, 2025: Nutrition or meal service requirement not met (407330B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Nutrition or meal service requirement not met

    407330F

    DCFS recorded on Jul 30, 2025: Nutrition or meal service requirement not met (407330F). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Nutrition or meal service requirement not met

    407330H

    DCFS recorded on Jul 30, 2025: Nutrition or meal service requirement not met (407330H). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Nutrition or meal service requirement not met

    407330J1

    DCFS recorded on Jul 30, 2025: Nutrition or meal service requirement not met (407330J1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Diapering or toileting requirement not met

    407340A2

    DCFS recorded on Jul 30, 2025: Diapering or toileting requirement not met (407340A2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Diapering or toileting requirement not met

    407340B

    DCFS recorded on Jul 30, 2025: Diapering or toileting requirement not met (407340B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Safe sleep practice requirement not met

    407350A

    DCFS recorded on Jul 30, 2025: Safe sleep practice requirement not met (407350A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Safe sleep practice requirement not met

    407350A4

    DCFS recorded on Jul 30, 2025: Safe sleep practice requirement not met (407350A4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    UNSAFE infant sleep position — SIDS risk (back-to-sleep required)

    407350B1

    DCFS recorded on Jul 30, 2025: UNSAFE infant sleep position — SIDS risk (back-to-sleep required) (407350B1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Safe sleep practice requirement not met

    407350I4

    DCFS recorded on Jul 30, 2025: Safe sleep practice requirement not met (407350I4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Safe sleep practice requirement not met

    407350L

    DCFS recorded on Jul 30, 2025: Safe sleep practice requirement not met (407350L). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Indoor facility or space safety requirement not met

    407370A

    DCFS recorded on Jul 30, 2025: Indoor facility or space safety requirement not met (407370A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Indoor facility or space safety requirement not met

    407370D2

    DCFS recorded on Jul 30, 2025: Indoor facility or space safety requirement not met (407370D2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Indoor facility or space safety requirement not met

    407370D3

    DCFS recorded on Jul 30, 2025: Indoor facility or space safety requirement not met (407370D3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Indoor facility or space safety requirement not met

    407370E

    DCFS recorded on Jul 30, 2025: Indoor facility or space safety requirement not met (407370E). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Indoor facility or space safety requirement not met

    407370E1C

    DCFS recorded on Jul 30, 2025: Indoor facility or space safety requirement not met (407370E1C). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Indoor facility or space safety requirement not met

    407370E3

    DCFS recorded on Jul 30, 2025: Indoor facility or space safety requirement not met (407370E3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Indoor building or maintenance safety hazard present

    407370E7

    DCFS recorded on Jul 30, 2025: Indoor building or maintenance safety hazard present (407370E7). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Indoor facility or space safety requirement not met

    407370E8

    DCFS recorded on Jul 30, 2025: Indoor facility or space safety requirement not met (407370E8). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Indoor facility or space safety requirement not met

    407370E9

    DCFS recorded on Jul 30, 2025: Indoor facility or space safety requirement not met (407370E9). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Indoor facility or space safety requirement not met

    407370E11

    DCFS recorded on Jul 30, 2025: Indoor facility or space safety requirement not met (407370E11). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Indoor facility or space safety requirement not met

    407370F1A

    DCFS recorded on Jul 30, 2025: Indoor facility or space safety requirement not met (407370F1A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Indoor facility or space safety requirement not met

    407370F1B

    DCFS recorded on Jul 30, 2025: Indoor facility or space safety requirement not met (407370F1B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Equipment or toy safety requirement not met

    407380B

    DCFS recorded on Jul 30, 2025: Equipment or toy safety requirement not met (407380B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Equipment or toy safety requirement not met

    407380E2

    DCFS recorded on Jul 30, 2025: Equipment or toy safety requirement not met (407380E2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Equipment or toy safety requirement not met

    407380E4

    DCFS recorded on Jul 30, 2025: Equipment or toy safety requirement not met (407380E4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Equipment or toy safety requirement not met

    407380F

    DCFS recorded on Jul 30, 2025: Equipment or toy safety requirement not met (407380F). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Equipment or toy safety requirement not met

    407380G

    DCFS recorded on Jul 30, 2025: Equipment or toy safety requirement not met (407380G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Outdoor playground safety requirement not met

    407390I

    DCFS recorded on Jul 30, 2025: Outdoor playground safety requirement not met (407390I). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 30, 2025 to Aug 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370Q1

    DCFS recorded on Jul 2, 2024: Indoor facility or space safety requirement not met (407370Q1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 2, 2024 to Jul 12, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370E3

    DCFS recorded on Jul 2, 2024: Indoor facility or space safety requirement not met (407370E3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 2, 2024 to Jul 12, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370C

    DCFS recorded on Jul 2, 2024: Indoor facility or space safety requirement not met (407370C). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 2, 2024 to Jul 12, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370E

    DCFS recorded on Jul 2, 2024: Indoor facility or space safety requirement not met (407370E). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 2, 2024 to Jul 12, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Radon testing proof missing for license renewal (IEMA-licensed tester required every 3 years)

    40760G

    DCFS recorded on Jul 2, 2024: Radon testing proof missing for license renewal (IEMA-licensed tester required every 3 years) (40760G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 2, 2024 to Jul 12, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370D4

    DCFS recorded on Jul 2, 2024: Indoor facility or space safety requirement not met (407370D4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jul 2, 2024 to Jul 12, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Infant & toddler special requirement not met

    407210C1

    DCFS recorded on Jun 12, 2024: Infant & toddler special requirement not met (407210C1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jun 12, 2024 to Jul 12, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370E

    DCFS recorded on Jun 12, 2024: Indoor facility or space safety requirement not met (407370E). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jun 12, 2024 to Jul 12, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370N

    DCFS recorded on Jun 12, 2024: Indoor facility or space safety requirement not met (407370N). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jun 12, 2024 to Jul 12, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Required staff-to-child ratio was not maintained

    407190A

    DCFS recorded on Jun 12, 2024: Required staff-to-child ratio was not maintained (407190A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jun 12, 2024 to Jul 12, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Program operations requirement not met

    407200I

    DCFS recorded on Jun 12, 2024: Program operations requirement not met (407200I). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jun 12, 2024 to Jul 12, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370D1

    DCFS recorded on Jun 12, 2024: Indoor facility or space safety requirement not met (407370D1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jun 12, 2024 to Jul 12, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

84 of 84 selected