GoldiCheck
← Back to the full record

Talk to the director

Child First Academy

814 W DIVERSEY PKWY, Chicago, IL 60614

For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.

Is it being fixed?

Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.

  • Past the correction deadline· open ~11 months

    Nutrition or meal service requirement not met

    407330L1

    DCFS recorded on Aug 26, 2025: Nutrition or meal service requirement not met (407330L1). It is recorded as past its correction deadline. A corrective plan ran from Aug 29, 2025 to Sep 5, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~11 months

    Indoor facility or space safety requirement not met

    407370E11

    DCFS recorded on Aug 26, 2025: Indoor facility or space safety requirement not met (407370E11). It is recorded as past its correction deadline. A corrective plan ran from Aug 29, 2025 to Sep 5, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~11 months

    Equipment or toy safety requirement not met

    407380J4

    DCFS recorded on Aug 26, 2025: Equipment or toy safety requirement not met (407380J4). It is recorded as past its correction deadline. A corrective plan ran from Aug 29, 2025 to Sep 5, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~11 months

    Equipment or toy safety requirement not met

    407380J5

    DCFS recorded on Aug 26, 2025: Equipment or toy safety requirement not met (407380J5). It is recorded as past its correction deadline. A corrective plan ran from Aug 29, 2025 to Sep 5, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

4 of 4 selected