Talk to the director
Christian Kids Care
100 E RANDOLPH ST, Fisher, IL 61843For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.
Is it being fixed?
Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.
- Confirmed — corrective plan in progress· opened recently
Enrollment or discharge procedure not followed
407250D
“DCFS recorded on Aug 4, 2026: Enrollment or discharge procedure not followed (407250D). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 4, 2026 to Sep 24, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· opened recently
Hand washing or hygiene requirement not met
407320
“DCFS recorded on Aug 4, 2026: Hand washing or hygiene requirement not met (407320). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 4, 2026 to Sep 24, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· opened recently
Outdoor playground safety requirement not met
407390M
“DCFS recorded on Aug 4, 2026: Outdoor playground safety requirement not met (407390M). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 4, 2026 to Sep 24, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· opened recently
Personnel records or documentation requirement not met
407120
“DCFS recorded on Aug 4, 2026: Personnel records or documentation requirement not met (407120). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 4, 2026 to Sep 24, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”