GoldiCheck
← Back to the full record

Talk to the director

Christian L-E-G Early Learning Center

446 E 43RD ST, Chicago, IL 60653

For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.

Is it being fixed?

Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.

  • Confirmed — corrective plan in progress· open ~12 months

    Organization and administration requirement not met (§407.70 general)

    40770I

    DCFS recorded on Aug 5, 2025: Organization and administration requirement not met (§407.70 general) (40770I). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 5, 2025 to Sep 5, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Indoor facility or space safety requirement not met

    407370E10

    DCFS recorded on Aug 5, 2025: Indoor facility or space safety requirement not met (407370E10). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 5, 2025 to Sep 5, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Staff qualification or training requirement not met

    407100I

    DCFS recorded on Aug 5, 2025: Staff qualification or training requirement not met (407100I). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 5, 2025 to Sep 5, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Infant & toddler special requirement not met

    407210F21

    DCFS recorded on Aug 5, 2025: Infant & toddler special requirement not met (407210F21). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 5, 2025 to Sep 5, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~12 months

    Daily arrival or departure procedure not followed

    407260F

    DCFS recorded on Aug 5, 2025: Daily arrival or departure procedure not followed (407260F). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 5, 2025 to Sep 5, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Child care director qualification requirement not met

    407130J

    DCFS recorded on Dec 20, 2023: Child care director qualification requirement not met (407130J). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 20, 2023 to Jan 20, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Staffing structure requirement not met (director oversight or on-site presence)

    40790A1

    DCFS recorded on Dec 20, 2023: Staffing structure requirement not met (director oversight or on-site presence) (40790A1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 20, 2023 to Jan 20, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)

    407110

    DCFS recorded on Dec 20, 2023: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 20, 2023 to Jan 20, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Diapering or toileting requirement not met

    407340A5

    DCFS recorded on Dec 20, 2023: Diapering or toileting requirement not met (407340A5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 20, 2023 to Jan 20, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Hand washing or hygiene requirement not met

    407320C

    DCFS recorded on Dec 20, 2023: Hand washing or hygiene requirement not met (407320C). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 20, 2023 to Jan 20, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Diapering or toileting requirement not met

    407340C

    DCFS recorded on Dec 20, 2023: Diapering or toileting requirement not met (407340C). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 20, 2023 to Jan 20, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Daily arrival or departure procedure not followed

    407260D

    DCFS recorded on Dec 20, 2023: Daily arrival or departure procedure not followed (407260D). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 20, 2023 to Jan 20, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370E12

    DCFS recorded on Dec 20, 2023: Indoor facility or space safety requirement not met (407370E12). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 20, 2023 to Jan 20, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    DISCIPLINE — rules on treatment of children not followed

    407270C2

    DCFS recorded on Dec 20, 2023: DISCIPLINE — rules on treatment of children not followed (407270C2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 20, 2023 to Jan 20, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

14 of 14 selected