GoldiCheck
← Back to the full record

Talk to the director

Creative Little Ones Academy

2809 W 59TH ST, Chicago, IL 60629

For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.

Is it being fixed?

Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.

  • Repeat — cited before, still not corrected· open ~9 months

    Indoor facility or space safety requirement not met

    407370E3

    DCFS recorded on Oct 16, 2025: Indoor facility or space safety requirement not met (407370E3). It was cited before and is recorded as still not corrected. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Repeat — cited before, still not corrected· open ~9 months

    Infant & toddler special requirement not met

    407210F24

    DCFS recorded on Oct 16, 2025: Infant & toddler special requirement not met (407210F24). It was cited before and is recorded as still not corrected. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Repeat — cited before, still not corrected· open ~9 months

    Annual 15-clock-hour in-service training requirement not met

    407100C5

    DCFS recorded on Oct 16, 2025: Annual 15-clock-hour in-service training requirement not met (407100C5). It was cited before and is recorded as still not corrected. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Repeat — cited before, still not corrected· open ~9 months

    Personnel records or documentation requirement not met

    407120A4

    DCFS recorded on Oct 16, 2025: Personnel records or documentation requirement not met (407120A4). It was cited before and is recorded as still not corrected. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Repeat — cited before, still not corrected· open ~9 months

    Personnel records or documentation requirement not met

    407120E1

    DCFS recorded on Oct 16, 2025: Personnel records or documentation requirement not met (407120E1). It was cited before and is recorded as still not corrected. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Repeat — cited before, still not corrected· open ~9 months

    Personnel records or documentation requirement not met

    407120E5

    DCFS recorded on Oct 16, 2025: Personnel records or documentation requirement not met (407120E5). It was cited before and is recorded as still not corrected. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Repeat — cited before, still not corrected· open ~9 months

    Personnel records or documentation requirement not met

    407120E4

    DCFS recorded on Oct 16, 2025: Personnel records or documentation requirement not met (407120E4). It was cited before and is recorded as still not corrected. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Repeat — cited before, still not corrected· open ~9 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790A1

    DCFS recorded on Oct 16, 2025: Staffing structure requirement not met (director oversight or on-site presence) (40790A1). It was cited before and is recorded as still not corrected. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Repeat — cited before, still not corrected· open ~9 months

    Background check not completed for a household or non-staff member

    FHSEC305

    DCFS recorded on Oct 16, 2025: Background check not completed for a household or non-staff member (FHSEC305). It was cited before and is recorded as still not corrected. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~23 months

    Indoor facility or space safety requirement not met

    407370G3

    DCFS recorded on Aug 30, 2024: Indoor facility or space safety requirement not met (407370G3). It is recorded as past its correction deadline. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~23 months

    Diapering or toileting requirement not met

    407340A2

    DCFS recorded on Aug 30, 2024: Diapering or toileting requirement not met (407340A2). It is recorded as past its correction deadline. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~23 months

    Indoor building or maintenance safety hazard present

    407370E7

    DCFS recorded on Aug 30, 2024: Indoor building or maintenance safety hazard present (407370E7). It is recorded as past its correction deadline. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~23 months

    Indoor facility or space safety requirement not met

    407370E11

    DCFS recorded on Aug 30, 2024: Indoor facility or space safety requirement not met (407370E11). It is recorded as past its correction deadline. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~23 months

    Staff qualification or training requirement not met

    407100H

    DCFS recorded on Aug 30, 2024: Staff qualification or training requirement not met (407100H). It is recorded as past its correction deadline. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~23 months

    Personnel records or documentation requirement not met

    407120E4

    DCFS recorded on Aug 30, 2024: Personnel records or documentation requirement not met (407120E4). It is recorded as past its correction deadline. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Indoor facility or space safety requirement not met

    407370D3

    DCFS recorded on Oct 16, 2025: Indoor facility or space safety requirement not met (407370D3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Indoor facility or space safety requirement not met

    407370E

    DCFS recorded on Oct 16, 2025: Indoor facility or space safety requirement not met (407370E). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Staff qualification or training requirement not met

    407100I

    DCFS recorded on Oct 16, 2025: Staff qualification or training requirement not met (407100I). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Nutrition or meal service requirement not met

    407330G

    DCFS recorded on Oct 16, 2025: Nutrition or meal service requirement not met (407330G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Nutrition or meal service requirement not met

    407330G

    DCFS recorded on Oct 16, 2025: Nutrition or meal service requirement not met (407330G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Indoor facility or space safety requirement not met

    407370F1

    DCFS recorded on Oct 16, 2025: Indoor facility or space safety requirement not met (407370F1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Indoor facility or space safety requirement not met

    407370T2

    DCFS recorded on Oct 16, 2025: Indoor facility or space safety requirement not met (407370T2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Equipment or toy safety requirement not met

    407380J4

    DCFS recorded on Oct 16, 2025: Equipment or toy safety requirement not met (407380J4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Radon testing proof missing for license renewal (IEMA-licensed tester required every 3 years)

    40760G

    DCFS recorded on Oct 16, 2025: Radon testing proof missing for license renewal (IEMA-licensed tester required every 3 years) (40760G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Indoor facility or space safety requirement not met

    407370E11

    DCFS recorded on Oct 16, 2025: Indoor facility or space safety requirement not met (407370E11). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Program operations requirement not met

    407200F5

    DCFS recorded on Oct 16, 2025: Program operations requirement not met (407200F5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Diapering or toileting requirement not met

    407340A5

    DCFS recorded on Oct 16, 2025: Diapering or toileting requirement not met (407340A5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Diapering or toileting requirement not met

    407340I

    DCFS recorded on Oct 16, 2025: Diapering or toileting requirement not met (407340I). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Diapering or toileting requirement not met

    407340K1

    DCFS recorded on Oct 16, 2025: Diapering or toileting requirement not met (407340K1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Outdoor playground safety requirement not met

    407390L1

    DCFS recorded on Oct 16, 2025: Outdoor playground safety requirement not met (407390L1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    SWIMMING/WADING — water safety requirement not met

    407290A

    DCFS recorded on Oct 16, 2025: SWIMMING/WADING — water safety requirement not met (407290A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Infant & toddler special requirement not met

    407210F19

    DCFS recorded on Oct 16, 2025: Infant & toddler special requirement not met (407210F19). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Personnel records or documentation requirement not met

    407120B

    DCFS recorded on Oct 16, 2025: Personnel records or documentation requirement not met (407120B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Personnel records or documentation requirement not met

    407120A

    DCFS recorded on Oct 16, 2025: Personnel records or documentation requirement not met (407120A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Personnel records or documentation requirement not met

    407120E2

    DCFS recorded on Oct 16, 2025: Personnel records or documentation requirement not met (407120E2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~9 months

    Personnel records or documentation requirement not met

    407120E3

    DCFS recorded on Oct 16, 2025: Personnel records or documentation requirement not met (407120E3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 16, 2025 to Nov 16, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Outdoor playground safety requirement not met

    407390L1

    DCFS recorded on Aug 30, 2024: Outdoor playground safety requirement not met (407390L1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Infant & toddler special requirement not met

    407210F24

    DCFS recorded on Aug 30, 2024: Infant & toddler special requirement not met (407210F24). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Annual 15-clock-hour in-service training requirement not met

    407100C5

    DCFS recorded on Aug 30, 2024: Annual 15-clock-hour in-service training requirement not met (407100C5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    UNSAFE infant sleep position — SIDS risk (back-to-sleep required)

    407350B1

    DCFS recorded on Aug 30, 2024: UNSAFE infant sleep position — SIDS risk (back-to-sleep required) (407350B1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Required staff-to-child ratio was not maintained

    407190E1

    DCFS recorded on Aug 30, 2024: Required staff-to-child ratio was not maintained (407190E1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Indoor facility or space safety requirement not met

    407370E3

    DCFS recorded on Aug 30, 2024: Indoor facility or space safety requirement not met (407370E3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790A1

    DCFS recorded on Aug 30, 2024: Staffing structure requirement not met (director oversight or on-site presence) (40790A1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790A3

    DCFS recorded on Aug 30, 2024: Staffing structure requirement not met (director oversight or on-site presence) (40790A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790B

    DCFS recorded on Aug 30, 2024: Staffing structure requirement not met (director oversight or on-site presence) (40790B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Background check not completed for a household or non-staff member

    FHSEC305

    DCFS recorded on Aug 30, 2024: Background check not completed for a household or non-staff member (FHSEC305). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Annual 15-clock-hour in-service training requirement not met

    407100C7

    DCFS recorded on Aug 30, 2024: Annual 15-clock-hour in-service training requirement not met (407100C7). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Pre-employment physical exam or TB screening missing

    407100D

    DCFS recorded on Aug 30, 2024: Pre-employment physical exam or TB screening missing (407100D). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Biennial staff physical re-examination not completed

    407100F

    DCFS recorded on Aug 30, 2024: Biennial staff physical re-examination not completed (407100F). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Personnel records or documentation requirement not met

    407120A3

    DCFS recorded on Aug 30, 2024: Personnel records or documentation requirement not met (407120A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Personnel records or documentation requirement not met

    407120A4

    DCFS recorded on Aug 30, 2024: Personnel records or documentation requirement not met (407120A4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Personnel records or documentation requirement not met

    407120E1

    DCFS recorded on Aug 30, 2024: Personnel records or documentation requirement not met (407120E1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~23 months

    Personnel records or documentation requirement not met

    407120A

    DCFS recorded on Aug 30, 2024: Personnel records or documentation requirement not met (407120A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Aug 30, 2024 to Oct 1, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

53 of 53 selected