Talk to the director
Early Achievers Preschool & Dev Center
45 E 34TH ST, Steger, IL 60475For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.
Is it being fixed?
Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.
- Confirmed — corrective plan in progress· open ~14 months
Indoor facility or space safety requirement not met
407370D4
“DCFS recorded on May 14, 2025: Indoor facility or space safety requirement not met (407370D4). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
UNSAFE infant sleep position — SIDS risk (back-to-sleep required)
407350B1B
“DCFS recorded on May 14, 2025: UNSAFE infant sleep position — SIDS risk (back-to-sleep required) (407350B1B). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Indoor building or maintenance safety hazard present
407370E7
“DCFS recorded on May 14, 2025: Indoor building or maintenance safety hazard present (407370E7). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Personnel records or documentation requirement not met
407120A1
“DCFS recorded on May 14, 2025: Personnel records or documentation requirement not met (407120A1). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Lead safety training certificate not submitted to local licensing office
407130M
“DCFS recorded on May 14, 2025: Lead safety training certificate not submitted to local licensing office (407130M). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Personnel records or documentation requirement not met
407120A
“DCFS recorded on May 14, 2025: Personnel records or documentation requirement not met (407120A). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Personnel records or documentation requirement not met
407120E4
“DCFS recorded on May 14, 2025: Personnel records or documentation requirement not met (407120E4). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Personnel records or documentation requirement not met
407120E1
“DCFS recorded on May 14, 2025: Personnel records or documentation requirement not met (407120E1). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)
407110
“DCFS recorded on May 14, 2025: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Pre-employment physical exam or TB screening missing
407100D
“DCFS recorded on May 14, 2025: Pre-employment physical exam or TB screening missing (407100D). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Annual 15-clock-hour in-service training requirement not met
407100C8
“DCFS recorded on May 14, 2025: Annual 15-clock-hour in-service training requirement not met (407100C8). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
License application requirement not met
40750B3
“DCFS recorded on May 14, 2025: License application requirement not met (40750B3). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Nutrition or meal service requirement not met
407330A
“DCFS recorded on May 14, 2025: Nutrition or meal service requirement not met (407330A). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Infant & toddler special requirement not met
407210B
“DCFS recorded on May 14, 2025: Infant & toddler special requirement not met (407210B). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Enrollment or discharge procedure not followed
407250C
“DCFS recorded on May 14, 2025: Enrollment or discharge procedure not followed (407250C). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Risk management plan not developed or maintained as required
40770K
“DCFS recorded on May 14, 2025: Risk management plan not developed or maintained as required (40770K). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Indoor facility or space safety requirement not met
407370E10
“DCFS recorded on May 14, 2025: Indoor facility or space safety requirement not met (407370E10). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Indoor facility or space safety requirement not met
407370A
“DCFS recorded on May 14, 2025: Indoor facility or space safety requirement not met (407370A). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
DISCIPLINE — rules on treatment of children not followed
407270A
“DCFS recorded on May 14, 2025: DISCIPLINE — rules on treatment of children not followed (407270A). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Indoor facility or space safety requirement not met
407370P1
“DCFS recorded on May 14, 2025: Indoor facility or space safety requirement not met (407370P1). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Staffing structure requirement not met (director oversight or on-site presence)
40790D
“DCFS recorded on May 14, 2025: Staffing structure requirement not met (director oversight or on-site presence) (40790D). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~14 months
Nutrition or meal service requirement not met
407330Q
“DCFS recorded on May 14, 2025: Nutrition or meal service requirement not met (407330Q). It was confirmed and a corrective plan is in progress. A corrective plan ran from May 25, 2025 to Jun 14, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”