Talk to the director
Gift 4 Kids Day Care Center
1305 W 111TH ST # 07, Chicago, IL 60643For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.
Is it being fixed?
Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.
- Confirmed — corrective plan in progress· open ~20 months
Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease)
407100C1
“DCFS recorded on Dec 5, 2024: Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease) (407100C1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 5, 2024 to Jan 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~20 months
Annual 15-hour in-service training not completed
407100C6
“DCFS recorded on Dec 5, 2024: Annual 15-hour in-service training not completed (407100C6). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 5, 2024 to Jan 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~20 months
Annual 15-clock-hour in-service training requirement not met
407100C8
“DCFS recorded on Dec 5, 2024: Annual 15-clock-hour in-service training requirement not met (407100C8). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 5, 2024 to Jan 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~20 months
Staff qualification or training requirement not met
407100I
“DCFS recorded on Dec 5, 2024: Staff qualification or training requirement not met (407100I). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 5, 2024 to Jan 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~20 months
Personnel records or documentation requirement not met
407120A
“DCFS recorded on Dec 5, 2024: Personnel records or documentation requirement not met (407120A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 5, 2024 to Jan 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~20 months
Required staff-to-child ratio was not maintained
407190E
“DCFS recorded on Dec 5, 2024: Required staff-to-child ratio was not maintained (407190E). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 5, 2024 to Jan 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~20 months
Infant & toddler special requirement not met
407210F24
“DCFS recorded on Dec 5, 2024: Infant & toddler special requirement not met (407210F24). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 5, 2024 to Jan 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~20 months
UNSAFE infant sleep position — SIDS risk (back-to-sleep required)
407350B1A
“DCFS recorded on Dec 5, 2024: UNSAFE infant sleep position — SIDS risk (back-to-sleep required) (407350B1A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 5, 2024 to Jan 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~20 months
Indoor facility or space safety requirement not met
407370E10
“DCFS recorded on Dec 5, 2024: Indoor facility or space safety requirement not met (407370E10). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 5, 2024 to Jan 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~20 months
Indoor facility or space safety requirement not met
407370F1
“DCFS recorded on Dec 5, 2024: Indoor facility or space safety requirement not met (407370F1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 5, 2024 to Jan 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”