Talk to the director
Hannah House Child Development Center
810 N WALL ST, Carbondale, IL 62901For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.
Is it being fixed?
Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.
- Past the correction deadline· open ~8 months
Radon testing proof missing for license renewal (IEMA-licensed tester required every 3 years)
40760G
“DCFS recorded on Dec 4, 2025: Radon testing proof missing for license renewal (IEMA-licensed tester required every 3 years) (40760G). It is recorded as past its correction deadline. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Past the correction deadline· open ~11 months
Infant & toddler special requirement not met
407210F24
“DCFS recorded on Aug 28, 2025: Infant & toddler special requirement not met (407210F24). It is recorded as past its correction deadline. A corrective plan ran from Aug 28, 2025 to Sep 28, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Past the correction deadline· open ~11 months
UNSAFE infant sleep position — SIDS risk (back-to-sleep required)
407350B1
“DCFS recorded on Aug 28, 2025: UNSAFE infant sleep position — SIDS risk (back-to-sleep required) (407350B1). It is recorded as past its correction deadline. A corrective plan ran from Aug 28, 2025 to Sep 28, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Required staff-to-child ratio was not maintained
407190E1
“DCFS recorded on Mar 5, 2024: Required staff-to-child ratio was not maintained (407190E1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 5, 2024 to May 17, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”