GoldiCheck
← Back to the full record

Talk to the director

Haven For Tots Day Care & Pre-School

4660 W 94TH ST, Oak Lawn, IL 60453

For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.

Is it being fixed?

Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.

  • Confirmed — corrective plan in progress· open ~16 months

    Risk management plan not developed or maintained as required

    40770K3

    DCFS recorded on Mar 12, 2025: Risk management plan not developed or maintained as required (40770K3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790A1

    DCFS recorded on Mar 12, 2025: Staffing structure requirement not met (director oversight or on-site presence) (40790A1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease)

    407100C1

    DCFS recorded on Mar 12, 2025: Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease) (407100C1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Annual 15-clock-hour in-service training requirement not met

    407100C5

    DCFS recorded on Mar 12, 2025: Annual 15-clock-hour in-service training requirement not met (407100C5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)

    407110

    DCFS recorded on Mar 12, 2025: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Personnel records or documentation requirement not met

    407120A3

    DCFS recorded on Mar 12, 2025: Personnel records or documentation requirement not met (407120A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Child care director qualification requirement not met

    407130A2

    DCFS recorded on Mar 12, 2025: Child care director qualification requirement not met (407130A2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Infant & toddler special requirement not met

    407210F19

    DCFS recorded on Mar 12, 2025: Infant & toddler special requirement not met (407210F19). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Infant & toddler special requirement not met

    407210F20

    DCFS recorded on Mar 12, 2025: Infant & toddler special requirement not met (407210F20). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Enrollment or discharge procedure not followed

    407250D

    DCFS recorded on Mar 12, 2025: Enrollment or discharge procedure not followed (407250D). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Daily arrival or departure procedure not followed

    407260F1

    DCFS recorded on Mar 12, 2025: Daily arrival or departure procedure not followed (407260F1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Child health record or immunization requirement not met

    407310A3

    DCFS recorded on Mar 12, 2025: Child health record or immunization requirement not met (407310A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Child health record or immunization requirement not met

    407310A5

    DCFS recorded on Mar 12, 2025: Child health record or immunization requirement not met (407310A5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Child health record or immunization requirement not met

    407310A6

    DCFS recorded on Mar 12, 2025: Child health record or immunization requirement not met (407310A6). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Hand washing or hygiene requirement not met

    407320A2

    DCFS recorded on Mar 12, 2025: Hand washing or hygiene requirement not met (407320A2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Hand washing or hygiene requirement not met

    407320A3

    DCFS recorded on Mar 12, 2025: Hand washing or hygiene requirement not met (407320A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Hand washing or hygiene requirement not met

    407320C

    DCFS recorded on Mar 12, 2025: Hand washing or hygiene requirement not met (407320C). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Nutrition or meal service requirement not met

    407330P

    DCFS recorded on Mar 12, 2025: Nutrition or meal service requirement not met (407330P). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Nutrition or meal service requirement not met

    407330P1

    DCFS recorded on Mar 12, 2025: Nutrition or meal service requirement not met (407330P1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Diapering or toileting requirement not met

    407340A5G

    DCFS recorded on Mar 12, 2025: Diapering or toileting requirement not met (407340A5G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Indoor facility or space safety requirement not met

    407370E11

    DCFS recorded on Mar 12, 2025: Indoor facility or space safety requirement not met (407370E11). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Outdoor playground safety requirement not met

    407390M

    DCFS recorded on Mar 12, 2025: Outdoor playground safety requirement not met (407390M). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 11, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Organization and administration requirement not met (§407.70 general)

    40770

    DCFS recorded on Mar 12, 2025: Organization and administration requirement not met (§407.70 general) (40770). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790A

    DCFS recorded on Mar 12, 2025: Staffing structure requirement not met (director oversight or on-site presence) (40790A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Staff qualification or training requirement not met

    407100

    DCFS recorded on Mar 12, 2025: Staff qualification or training requirement not met (407100). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)

    407110

    DCFS recorded on Mar 12, 2025: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Personnel records or documentation requirement not met

    407120

    DCFS recorded on Mar 12, 2025: Personnel records or documentation requirement not met (407120). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Child care director qualification requirement not met

    407130

    DCFS recorded on Mar 12, 2025: Child care director qualification requirement not met (407130). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    School-age program requirement not met

    407220

    DCFS recorded on Mar 12, 2025: School-age program requirement not met (407220). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Intergenerational program requirement not met

    407230

    DCFS recorded on Mar 12, 2025: Intergenerational program requirement not met (407230). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Evening/night/weekend/holiday care requirement not met

    407240

    DCFS recorded on Mar 12, 2025: Evening/night/weekend/holiday care requirement not met (407240). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Enrollment or discharge procedure not followed

    407250

    DCFS recorded on Mar 12, 2025: Enrollment or discharge procedure not followed (407250). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Daily arrival or departure procedure not followed

    407260

    DCFS recorded on Mar 12, 2025: Daily arrival or departure procedure not followed (407260). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Child health record or immunization requirement not met

    407310

    DCFS recorded on Mar 12, 2025: Child health record or immunization requirement not met (407310). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Hand washing or hygiene requirement not met

    407320

    DCFS recorded on Mar 12, 2025: Hand washing or hygiene requirement not met (407320). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Nutrition or meal service requirement not met

    407330

    DCFS recorded on Mar 12, 2025: Nutrition or meal service requirement not met (407330). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Diapering or toileting requirement not met

    407340

    DCFS recorded on Mar 12, 2025: Diapering or toileting requirement not met (407340). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Indoor facility or space safety requirement not met

    407370

    DCFS recorded on Mar 12, 2025: Indoor facility or space safety requirement not met (407370). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~16 months

    Equipment or toy safety requirement not met

    407380

    DCFS recorded on Mar 12, 2025: Equipment or toy safety requirement not met (407380). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 12, 2025 to Apr 12, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

39 of 39 selected