1224 DEMPSTER ST, Evanston, IL 60202For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.
Is it being fixed?
Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.
- Past the correction deadline· open ~2 years
Staff qualification or training requirement not met
407100I
“DCFS recorded on Aug 14, 2023: Staff qualification or training requirement not met (407100I). It is recorded as past its correction deadline. A corrective plan ran from Aug 14, 2023 to Sep 15, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Past the correction deadline· open ~2 years
Equipment or toy safety requirement not met
407380J6
“DCFS recorded on Aug 14, 2023: Equipment or toy safety requirement not met (407380J6). It is recorded as past its correction deadline. A corrective plan ran from Aug 14, 2023 to Sep 15, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~8 months
Biennial staff physical re-examination not completed
407100F
“DCFS recorded on Dec 1, 2025: Biennial staff physical re-examination not completed (407100F). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 1, 2025 to Dec 31, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~8 months
Personnel records or documentation requirement not met
407120A3
“DCFS recorded on Dec 1, 2025: Personnel records or documentation requirement not met (407120A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 1, 2025 to Dec 31, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~8 months
Personnel records or documentation requirement not met
407120A4
“DCFS recorded on Dec 1, 2025: Personnel records or documentation requirement not met (407120A4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 1, 2025 to Dec 31, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~8 months
Child health record or immunization requirement not met
407310A
“DCFS recorded on Dec 1, 2025: Child health record or immunization requirement not met (407310A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 1, 2025 to Dec 31, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”