Talk to the director
Lots Of Love Nfp
1015 W 79TH ST, Chicago, IL 60620For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.
Is it being fixed?
Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.
- Confirmed — corrective plan in progress· open ~5 months
Radon testing proof missing for license renewal (IEMA-licensed tester required every 3 years)
40760G
“DCFS recorded on Mar 2, 2026: Radon testing proof missing for license renewal (IEMA-licensed tester required every 3 years) (40760G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 2, 2026 to Apr 1, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~5 months
Staffing structure requirement not met (director oversight or on-site presence)
40790D
“DCFS recorded on Mar 2, 2026: Staffing structure requirement not met (director oversight or on-site presence) (40790D). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 2, 2026 to Apr 1, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~5 months
Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease)
407100C1
“DCFS recorded on Mar 2, 2026: Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease) (407100C1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 2, 2026 to Apr 1, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~5 months
Personnel records or documentation requirement not met
407120A2
“DCFS recorded on Mar 2, 2026: Personnel records or documentation requirement not met (407120A2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 2, 2026 to Apr 1, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~5 months
Child health record or immunization requirement not met
407310A5
“DCFS recorded on Mar 2, 2026: Child health record or immunization requirement not met (407310A5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 2, 2026 to Apr 1, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~5 months
Child health record or immunization requirement not met
407310A6
“DCFS recorded on Mar 2, 2026: Child health record or immunization requirement not met (407310A6). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 2, 2026 to Apr 1, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~5 months
Diapering or toileting requirement not met
407340A5L
“DCFS recorded on Mar 2, 2026: Diapering or toileting requirement not met (407340A5L). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 2, 2026 to Apr 1, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~5 months
Indoor facility or space safety requirement not met
407370E2
“DCFS recorded on Mar 2, 2026: Indoor facility or space safety requirement not met (407370E2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 2, 2026 to Apr 1, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~5 months
Indoor facility or space safety requirement not met
407370E6
“DCFS recorded on Mar 2, 2026: Indoor facility or space safety requirement not met (407370E6). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 2, 2026 to Apr 1, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~5 months
Indoor facility or space safety requirement not met
407370P3
“DCFS recorded on Mar 2, 2026: Indoor facility or space safety requirement not met (407370P3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 2, 2026 to Apr 1, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~5 months
Equipment or toy safety requirement not met
407380G
“DCFS recorded on Mar 2, 2026: Equipment or toy safety requirement not met (407380G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 2, 2026 to Apr 1, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”