GoldiCheck
← Back to the full record

Talk to the director

Mary Crane Center Lake & Pulaski

316 N PULASKI RD, Chicago, IL 60624

For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.

Is it being fixed?

Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.

  • Past the correction deadline· open ~10 months

    Staff orientation — required document reviews not recorded in personnel files

    40770E

    DCFS recorded on Sep 24, 2025: Staff orientation — required document reviews not recorded in personnel files (40770E). It is recorded as past its correction deadline. A corrective plan ran from Sep 24, 2025 to Oct 24, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~10 months

    Personnel records or documentation requirement not met

    407120A1

    DCFS recorded on Sep 24, 2025: Personnel records or documentation requirement not met (407120A1). It is recorded as past its correction deadline. A corrective plan ran from Sep 24, 2025 to Oct 24, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~10 months

    Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)

    407110

    DCFS recorded on Sep 24, 2025: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It is recorded as past its correction deadline. A corrective plan ran from Sep 24, 2025 to Oct 24, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~10 months

    Indoor facility or space safety requirement not met

    407370E11

    DCFS recorded on Sep 24, 2025: Indoor facility or space safety requirement not met (407370E11). It is recorded as past its correction deadline. A corrective plan ran from Sep 24, 2025 to Oct 24, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~2 years

    Indoor facility or space safety requirement not met

    407370E3

    DCFS recorded on Sep 8, 2023: Indoor facility or space safety requirement not met (407370E3). It is recorded as past its correction deadline. A corrective plan ran from Sep 8, 2023 to Oct 8, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~2 years

    Indoor facility or space safety requirement not met

    407370F2

    DCFS recorded on Sep 8, 2023: Indoor facility or space safety requirement not met (407370F2). It is recorded as past its correction deadline. A corrective plan ran from Sep 8, 2023 to Oct 8, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?

6 of 6 selected