For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.

Is it being fixed?

Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.

  • Confirmed — corrective plan in progress· open ~19 months

    Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease)

    407100C1

    DCFS recorded on Jan 7, 2025: Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease) (407100C1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    Annual 15-clock-hour in-service training requirement not met

    407100C5

    DCFS recorded on Jan 7, 2025: Annual 15-clock-hour in-service training requirement not met (407100C5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    Personnel records or documentation requirement not met

    407120A

    DCFS recorded on Jan 7, 2025: Personnel records or documentation requirement not met (407120A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    Personnel records or documentation requirement not met

    407120A4

    DCFS recorded on Jan 7, 2025: Personnel records or documentation requirement not met (407120A4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    Early childhood teacher qualification not met

    407140C

    DCFS recorded on Jan 7, 2025: Early childhood teacher qualification not met (407140C). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    Early childhood assistant qualification not met

    407150A

    DCFS recorded on Jan 7, 2025: Early childhood assistant qualification not met (407150A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    Volunteer requirement not met

    407180A

    DCFS recorded on Jan 7, 2025: Volunteer requirement not met (407180A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    UNSAFE infant sleep position — SIDS risk (back-to-sleep required)

    407350B1

    DCFS recorded on Jan 7, 2025: UNSAFE infant sleep position — SIDS risk (back-to-sleep required) (407350B1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    Indoor facility or space safety requirement not met

    407370D2A

    DCFS recorded on Jan 7, 2025: Indoor facility or space safety requirement not met (407370D2A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    Indoor facility or space safety requirement not met

    407370E

    DCFS recorded on Jan 7, 2025: Indoor facility or space safety requirement not met (407370E). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    Indoor facility or space safety requirement not met

    407370E3

    DCFS recorded on Jan 7, 2025: Indoor facility or space safety requirement not met (407370E3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    Indoor facility or space safety requirement not met

    407370E6

    DCFS recorded on Jan 7, 2025: Indoor facility or space safety requirement not met (407370E6). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    Indoor building or maintenance safety hazard present

    407370E7

    DCFS recorded on Jan 7, 2025: Indoor building or maintenance safety hazard present (407370E7). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    Indoor facility or space safety requirement not met

    407370E11

    DCFS recorded on Jan 7, 2025: Indoor facility or space safety requirement not met (407370E11). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~19 months

    Equipment or toy safety requirement not met

    407380G

    DCFS recorded on Jan 7, 2025: Equipment or toy safety requirement not met (407380G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Jan 7, 2025 to Feb 6, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Staffing structure requirement not met (director oversight or on-site presence)

    40790F2

    DCFS recorded on Feb 21, 2024: Staffing structure requirement not met (director oversight or on-site presence) (40790F2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 21, 2024 to Mar 6, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Staff qualification or training requirement not met

    407100B1

    DCFS recorded on Feb 21, 2024: Staff qualification or training requirement not met (407100B1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 21, 2024 to Mar 6, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Staffing structure requirement not met (director oversight or on-site presence)

    40790D1

    DCFS recorded on Feb 21, 2024: Staffing structure requirement not met (director oversight or on-site presence) (40790D1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 21, 2024 to Mar 6, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)

    407110

    DCFS recorded on Feb 21, 2024: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 21, 2024 to Mar 6, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Personnel records or documentation requirement not met

    407120

    DCFS recorded on Feb 21, 2024: Personnel records or documentation requirement not met (407120). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 21, 2024 to Mar 6, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370E6

    DCFS recorded on Feb 21, 2024: Indoor facility or space safety requirement not met (407370E6). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 21, 2024 to Mar 6, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Equipment or toy safety requirement not met

    407380

    DCFS recorded on Feb 21, 2024: Equipment or toy safety requirement not met (407380). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 21, 2024 to Mar 6, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Infant & toddler special requirement not met

    407210F8

    DCFS recorded on Feb 21, 2024: Infant & toddler special requirement not met (407210F8). It was confirmed and a corrective plan is in progress. A corrective plan ran from Feb 21, 2024 to Mar 6, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 yearsProtective plan

    Staff used PROHIBITED PHYSICAL DISCIPLINE on a child

    407270C6A

    DCFS recorded on Dec 11, 2023: Staff used PROHIBITED PHYSICAL DISCIPLINE on a child (407270C6A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 11, 2023 to Dec 12, 2023. I also noticed a protective plan on the record around this. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 yearsProtective plan

    Children were NOT properly supervised

    407200R

    DCFS recorded on Dec 11, 2023: Children were NOT properly supervised (407200R). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 11, 2023 to Dec 12, 2023. I also noticed a protective plan on the record around this. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 yearsProtective plan

    Staff worked with children WITHOUT completed background check

    407100A10

    DCFS recorded on Dec 11, 2023: Staff worked with children WITHOUT completed background check (407100A10). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 11, 2023 to Dec 12, 2023. I also noticed a protective plan on the record around this. Could you confirm whether it has been corrected and share the sign-off or documentation?

26 of 26 selected