For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.

Is it being fixed?

Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.

  • Past the correction deadline· open ~3 months

    Safe sleep practice requirement not met

    407350I

    DCFS recorded on Apr 20, 2026: Safe sleep practice requirement not met (407350I). It is recorded as past its correction deadline. A corrective plan ran from Apr 20, 2026 to May 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~3 months

    Indoor facility or space safety requirement not met

    407370E11

    DCFS recorded on Apr 20, 2026: Indoor facility or space safety requirement not met (407370E11). It is recorded as past its correction deadline. A corrective plan ran from Apr 20, 2026 to May 19, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Past the correction deadline· open ~13 months

    Required staff-to-child ratio was not maintained

    407190

    DCFS recorded on Jun 11, 2025: Required staff-to-child ratio was not maintained (407190). It is recorded as past its correction deadline. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Staffing structure requirement not met (director oversight or on-site presence)

    40790A3

    DCFS recorded on Mar 20, 2024: Staffing structure requirement not met (director oversight or on-site presence) (40790A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease)

    407100C1

    DCFS recorded on Mar 20, 2024: Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease) (407100C1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Annual 15-clock-hour in-service training requirement not met

    407100C5

    DCFS recorded on Mar 20, 2024: Annual 15-clock-hour in-service training requirement not met (407100C5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Annual 15-clock-hour in-service training requirement not met

    407100C7

    DCFS recorded on Mar 20, 2024: Annual 15-clock-hour in-service training requirement not met (407100C7). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Annual 15-clock-hour in-service training requirement not met

    407100C8

    DCFS recorded on Mar 20, 2024: Annual 15-clock-hour in-service training requirement not met (407100C8). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Staff qualification or training requirement not met

    407100H

    DCFS recorded on Mar 20, 2024: Staff qualification or training requirement not met (407100H). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)

    407110

    DCFS recorded on Mar 20, 2024: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Personnel records or documentation requirement not met

    407120A

    DCFS recorded on Mar 20, 2024: Personnel records or documentation requirement not met (407120A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Personnel records or documentation requirement not met

    407120A2

    DCFS recorded on Mar 20, 2024: Personnel records or documentation requirement not met (407120A2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Personnel records or documentation requirement not met

    407120A3

    DCFS recorded on Mar 20, 2024: Personnel records or documentation requirement not met (407120A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Personnel records or documentation requirement not met

    407120A4

    DCFS recorded on Mar 20, 2024: Personnel records or documentation requirement not met (407120A4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Personnel records or documentation requirement not met

    407120E4

    DCFS recorded on Mar 20, 2024: Personnel records or documentation requirement not met (407120E4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Director missing required disability-inclusion training certificate (6+ clock hours, within 36 months of appointment)

    407130K

    DCFS recorded on Mar 20, 2024: Director missing required disability-inclusion training certificate (6+ clock hours, within 36 months of appointment) (407130K). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    DISCIPLINE — rules on treatment of children not followed

    407270A

    DCFS recorded on Mar 20, 2024: DISCIPLINE — rules on treatment of children not followed (407270A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Child health record or immunization requirement not met

    407310A

    DCFS recorded on Mar 20, 2024: Child health record or immunization requirement not met (407310A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Nutrition or meal service requirement not met

    407330G1

    DCFS recorded on Mar 20, 2024: Nutrition or meal service requirement not met (407330G1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Nutrition or meal service requirement not met

    407330L1

    DCFS recorded on Mar 20, 2024: Nutrition or meal service requirement not met (407330L1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Diapering or toileting requirement not met

    407340A5

    DCFS recorded on Mar 20, 2024: Diapering or toileting requirement not met (407340A5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370E3

    DCFS recorded on Mar 20, 2024: Indoor facility or space safety requirement not met (407370E3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~2 years

    Indoor facility or space safety requirement not met

    407370

    DCFS recorded on Mar 20, 2024: Indoor facility or space safety requirement not met (407370). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 20, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?