Talk to the director
Tender Care Early Learning Center
1901 S 9TH AVE, Maywood, IL 60153For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.
Is it being fixed?
Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.
- Confirmed — corrective plan in progress· open ~10 months
Background check not completed for a household or non-staff member
FHSEC305
“DCFS recorded on Sep 23, 2025: Background check not completed for a household or non-staff member (FHSEC305). It was confirmed and a corrective plan is in progress. A corrective plan ran from Sep 23, 2025 to Oct 23, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Required staff-to-child ratio was not maintained
407190G
“DCFS recorded on Apr 12, 2024: Required staff-to-child ratio was not maintained (407190G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 12, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Child care director qualification requirement not met
407130L1
“DCFS recorded on Apr 12, 2024: Child care director qualification requirement not met (407130L1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 12, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Indoor facility or space safety requirement not met
407370E
“DCFS recorded on Apr 12, 2024: Indoor facility or space safety requirement not met (407370E). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 12, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)
407110
“DCFS recorded on Apr 12, 2024: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 12, 2024 to Apr 19, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Child care director qualification requirement not met
407130L2
“DCFS recorded on Dec 6, 2023: Child care director qualification requirement not met (407130L2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 6, 2023 to Dec 7, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Staff orientation — required document reviews not recorded in personnel files
40770E
“DCFS recorded on Oct 11, 2023: Staff orientation — required document reviews not recorded in personnel files (40770E). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease)
407100C1
“DCFS recorded on Oct 11, 2023: Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease) (407100C1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Annual 15-clock-hour in-service training requirement not met
407100C5
“DCFS recorded on Oct 11, 2023: Annual 15-clock-hour in-service training requirement not met (407100C5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Annual 15-hour in-service training not completed
407100C6
“DCFS recorded on Oct 11, 2023: Annual 15-hour in-service training not completed (407100C6). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Annual 15-clock-hour in-service training requirement not met
407100C7
“DCFS recorded on Oct 11, 2023: Annual 15-clock-hour in-service training requirement not met (407100C7). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)
407110
“DCFS recorded on Oct 11, 2023: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Personnel records or documentation requirement not met
407120A
“DCFS recorded on Oct 11, 2023: Personnel records or documentation requirement not met (407120A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Personnel records or documentation requirement not met
407120A2
“DCFS recorded on Oct 11, 2023: Personnel records or documentation requirement not met (407120A2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Personnel records or documentation requirement not met
407120A3
“DCFS recorded on Oct 11, 2023: Personnel records or documentation requirement not met (407120A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Personnel records or documentation requirement not met
407120A4
“DCFS recorded on Oct 11, 2023: Personnel records or documentation requirement not met (407120A4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Personnel records or documentation requirement not met
407120A6
“DCFS recorded on Oct 11, 2023: Personnel records or documentation requirement not met (407120A6). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
DISCIPLINE — rules on treatment of children not followed
407270A
“DCFS recorded on Oct 11, 2023: DISCIPLINE — rules on treatment of children not followed (407270A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Nutrition or meal service requirement not met
407330G
“DCFS recorded on Oct 11, 2023: Nutrition or meal service requirement not met (407330G). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Indoor facility or space safety requirement not met
407370A
“DCFS recorded on Oct 11, 2023: Indoor facility or space safety requirement not met (407370A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Equipment or toy safety requirement not met
407380B
“DCFS recorded on Oct 11, 2023: Equipment or toy safety requirement not met (407380B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Child care director qualification requirement not met
407130L2
“DCFS recorded on Oct 11, 2023: Child care director qualification requirement not met (407130L2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Oct 11, 2023 to Nov 10, 2023. Could you confirm whether it has been corrected and share the sign-off or documentation?”