Talk to the director
Walk By Faith Learning Center
1801 N BROADWAY ST, Crest Hill, IL 60403For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.
Is it being fixed?
Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.
- Repeat — cited before, still not corrected· open ~16 months
Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)
407110
“DCFS recorded on Mar 31, 2025: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was cited before and is recorded as still not corrected. A corrective plan ran from Mar 31, 2025 to Apr 30, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Staffing structure requirement not met (director oversight or on-site presence)
40790A
“DCFS recorded on May 2, 2024: Staffing structure requirement not met (director oversight or on-site presence) (40790A). It was cited before and is recorded as still not corrected. A corrective plan ran from May 2, 2024 to Jun 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Staffing structure requirement not met (director oversight or on-site presence)
40790A3
“DCFS recorded on May 2, 2024: Staffing structure requirement not met (director oversight or on-site presence) (40790A3). It was cited before and is recorded as still not corrected. A corrective plan ran from May 2, 2024 to Jun 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Staffing structure requirement not met (director oversight or on-site presence)
40790F
“DCFS recorded on May 2, 2024: Staffing structure requirement not met (director oversight or on-site presence) (40790F). It was cited before and is recorded as still not corrected. A corrective plan ran from May 2, 2024 to Jun 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Child care director qualification requirement not met
407130J
“DCFS recorded on May 2, 2024: Child care director qualification requirement not met (407130J). It was cited before and is recorded as still not corrected. A corrective plan ran from May 2, 2024 to Jun 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Child care director qualification requirement not met
407130L2
“DCFS recorded on May 2, 2024: Child care director qualification requirement not met (407130L2). It was cited before and is recorded as still not corrected. A corrective plan ran from May 2, 2024 to Jun 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Required staff-to-child ratio was not maintained
407190A
“DCFS recorded on May 2, 2024: Required staff-to-child ratio was not maintained (407190A). It was cited before and is recorded as still not corrected. A corrective plan ran from May 2, 2024 to Jun 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Required staff-to-child ratio was not maintained
407190G
“DCFS recorded on May 2, 2024: Required staff-to-child ratio was not maintained (407190G). It was cited before and is recorded as still not corrected. A corrective plan ran from May 2, 2024 to Jun 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Program operations requirement not met
407200P
“DCFS recorded on May 2, 2024: Program operations requirement not met (407200P). It was cited before and is recorded as still not corrected. A corrective plan ran from May 2, 2024 to Jun 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Daily arrival or departure procedure not followed
407260D
“DCFS recorded on May 2, 2024: Daily arrival or departure procedure not followed (407260D). It was cited before and is recorded as still not corrected. A corrective plan ran from May 2, 2024 to Jun 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Nutrition or meal service requirement not met
407330B
“DCFS recorded on May 2, 2024: Nutrition or meal service requirement not met (407330B). It was cited before and is recorded as still not corrected. A corrective plan ran from May 2, 2024 to Jun 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Annual 15-clock-hour in-service training requirement not met
407100C5
“DCFS recorded on Apr 3, 2024: Annual 15-clock-hour in-service training requirement not met (407100C5). It was cited before and is recorded as still not corrected. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Personnel records or documentation requirement not met
407120A6
“DCFS recorded on Apr 3, 2024: Personnel records or documentation requirement not met (407120A6). It was cited before and is recorded as still not corrected. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Required staff-to-child ratio was not maintained
407190A
“DCFS recorded on Apr 3, 2024: Required staff-to-child ratio was not maintained (407190A). It was cited before and is recorded as still not corrected. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Program operations requirement not met
407200P
“DCFS recorded on Apr 3, 2024: Program operations requirement not met (407200P). It was cited before and is recorded as still not corrected. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Enrollment or discharge procedure not followed
407250I2A
“DCFS recorded on Apr 3, 2024: Enrollment or discharge procedure not followed (407250I2A). It was cited before and is recorded as still not corrected. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Child health record or immunization requirement not met
407310A5
“DCFS recorded on Apr 3, 2024: Child health record or immunization requirement not met (407310A5). It was cited before and is recorded as still not corrected. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Repeat — cited before, still not corrected· open ~2 years
Child health record or immunization requirement not met
407310A6
“DCFS recorded on Apr 3, 2024: Child health record or immunization requirement not met (407310A6). It was cited before and is recorded as still not corrected. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~16 months
Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease)
407100C1
“DCFS recorded on Mar 31, 2025: Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease) (407100C1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 31, 2025 to Apr 30, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Staffing structure requirement not met (director oversight or on-site presence)
40790A
“DCFS recorded on Apr 3, 2024: Staffing structure requirement not met (director oversight or on-site presence) (40790A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Staffing structure requirement not met (director oversight or on-site presence)
40790A3
“DCFS recorded on Apr 3, 2024: Staffing structure requirement not met (director oversight or on-site presence) (40790A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Staffing structure requirement not met (director oversight or on-site presence)
40790F
“DCFS recorded on Apr 3, 2024: Staffing structure requirement not met (director oversight or on-site presence) (40790F). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease)
407100C1
“DCFS recorded on Apr 3, 2024: Required pre-service or early in-service training not completed (mandated reporter, life safety, emergency plan, communicable disease) (407100C1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Annual 15-clock-hour in-service training requirement not met
407100C8
“DCFS recorded on Apr 3, 2024: Annual 15-clock-hour in-service training requirement not met (407100C8). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Child care director qualification requirement not met
407130J
“DCFS recorded on Apr 3, 2024: Child care director qualification requirement not met (407130J). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Child care director qualification requirement not met
407130L2
“DCFS recorded on Apr 3, 2024: Child care director qualification requirement not met (407130L2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Staff counted toward ratios without meeting required qualification
407190F
“DCFS recorded on Apr 3, 2024: Staff counted toward ratios without meeting required qualification (407190F). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Infant & toddler special requirement not met
407210B
“DCFS recorded on Apr 3, 2024: Infant & toddler special requirement not met (407210B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Daily arrival or departure procedure not followed
407260D
“DCFS recorded on Apr 3, 2024: Daily arrival or departure procedure not followed (407260D). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Child health record or immunization requirement not met
407310D
“DCFS recorded on Apr 3, 2024: Child health record or immunization requirement not met (407310D). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Nutrition or meal service requirement not met
407330B
“DCFS recorded on Apr 3, 2024: Nutrition or meal service requirement not met (407330B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Indoor facility or space safety requirement not met
407370E4
“DCFS recorded on Apr 3, 2024: Indoor facility or space safety requirement not met (407370E4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Indoor facility or space safety requirement not met
407370F1
“DCFS recorded on Apr 3, 2024: Indoor facility or space safety requirement not met (407370F1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~2 years
Equipment or toy safety requirement not met
407380J7
“DCFS recorded on Apr 3, 2024: Equipment or toy safety requirement not met (407380J7). It was confirmed and a corrective plan is in progress. A corrective plan ran from Apr 3, 2024 to May 3, 2024. Could you confirm whether it has been corrected and share the sign-off or documentation?”