GoldiCheck
← Back to the full record

Talk to the director

Windy City Kiddie Academy

831 E 162ND ST, South Holland, IL 60473

For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.

Is it being fixed?

Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.

  • Confirmed — corrective plan in progress· open ~8 months

    Staff orientation — required document reviews not recorded in personnel files

    40770E

    DCFS recorded on Nov 20, 2025: Staff orientation — required document reviews not recorded in personnel files (40770E). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Organization and administration requirement not met (§407.70 general)

    40770I

    DCFS recorded on Nov 20, 2025: Organization and administration requirement not met (§407.70 general) (40770I). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Organization and administration requirement not met (§407.70 general)

    40770L

    DCFS recorded on Nov 20, 2025: Organization and administration requirement not met (§407.70 general) (40770L). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790B

    DCFS recorded on Nov 20, 2025: Staffing structure requirement not met (director oversight or on-site presence) (40790B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Staffing structure requirement not met (director oversight or on-site presence)

    40790D1

    DCFS recorded on Nov 20, 2025: Staffing structure requirement not met (director oversight or on-site presence) (40790D1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Biennial staff physical re-examination not completed

    407100F

    DCFS recorded on Nov 20, 2025: Biennial staff physical re-examination not completed (407100F). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children)

    407110

    DCFS recorded on Nov 20, 2025: Background check NOT completed or documented for personnel (or probationary employee left unsupervised with children) (407110). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Personnel records or documentation requirement not met

    407120A1

    DCFS recorded on Nov 20, 2025: Personnel records or documentation requirement not met (407120A1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Personnel records or documentation requirement not met

    407120A3

    DCFS recorded on Nov 20, 2025: Personnel records or documentation requirement not met (407120A3). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Personnel records or documentation requirement not met

    407120E1

    DCFS recorded on Nov 20, 2025: Personnel records or documentation requirement not met (407120E1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Personnel records or documentation requirement not met

    407120E4

    DCFS recorded on Nov 20, 2025: Personnel records or documentation requirement not met (407120E4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Personnel records or documentation requirement not met

    407120E5

    DCFS recorded on Nov 20, 2025: Personnel records or documentation requirement not met (407120E5). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Personnel records or documentation requirement not met

    407120F1

    DCFS recorded on Nov 20, 2025: Personnel records or documentation requirement not met (407120F1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Infant & toddler special requirement not met

    407210B

    DCFS recorded on Nov 20, 2025: Infant & toddler special requirement not met (407210B). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Enrollment or discharge procedure not followed

    407250I1

    DCFS recorded on Nov 20, 2025: Enrollment or discharge procedure not followed (407250I1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Enrollment or discharge procedure not followed

    407250I2

    DCFS recorded on Nov 20, 2025: Enrollment or discharge procedure not followed (407250I2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    DISCIPLINE — rules on treatment of children not followed

    407270A

    DCFS recorded on Nov 20, 2025: DISCIPLINE — rules on treatment of children not followed (407270A). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Child health record or immunization requirement not met

    407310A4

    DCFS recorded on Nov 20, 2025: Child health record or immunization requirement not met (407310A4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Nutrition or meal service requirement not met

    407330L1

    DCFS recorded on Nov 20, 2025: Nutrition or meal service requirement not met (407330L1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

  • Confirmed — corrective plan in progress· open ~8 months

    Indoor facility or space safety requirement not met

    407370F2

    DCFS recorded on Nov 20, 2025: Indoor facility or space safety requirement not met (407370F2). It was confirmed and a corrective plan is in progress. A corrective plan ran from Nov 20, 2025 to Dec 20, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?

20 of 20 selected