Talk to the director
Wonderland Child Care Center Corporation…
6156 W BELMONT AVE, Chicago, IL 60634For parents already enrolled here. Below are the findings that aren't confirmed resolved yet, each with a respectful question you can bring to the director — as a partner, not a gotcha. Copy one, or the whole summary to share with other parents.
Is it being fixed?
Tick the findings you want to raise, then print a handout for the meeting or copy them to share with other parents. Bring them collaboratively — regulators can take months to log a correction, so ask for the sign-off rather than assuming.
- Confirmed — corrective plan in progress· open ~4 months
Enrollment or discharge procedure not followed
407250D
“DCFS recorded on Mar 27, 2026: Enrollment or discharge procedure not followed (407250D). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 27, 2026 to Apr 26, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~4 months
Nutrition or meal service requirement not met
407330L1
“DCFS recorded on Mar 27, 2026: Nutrition or meal service requirement not met (407330L1). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 27, 2026 to Apr 26, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~4 months
Indoor facility or space safety requirement not met
407370E4
“DCFS recorded on Mar 27, 2026: Indoor facility or space safety requirement not met (407370E4). It was confirmed and a corrective plan is in progress. A corrective plan ran from Mar 27, 2026 to Apr 26, 2026. Could you confirm whether it has been corrected and share the sign-off or documentation?”
- Confirmed — corrective plan in progress· open ~19 months
Outdoor playground safety requirement not met
407390L
“DCFS recorded on Dec 30, 2024: Outdoor playground safety requirement not met (407390L). It was confirmed and a corrective plan is in progress. A corrective plan ran from Dec 30, 2024 to Jan 29, 2025. Could you confirm whether it has been corrected and share the sign-off or documentation?”